Talk to a Mustang Sales Tech
1-877-887-1105
M-F 8:30A-11P, Sat-Sun 8:30A-9P
$20K Sweeps! 10 Chances to Win! Enter Daily >

Best Sellers

How to Install BMR Billet Aluminum Vertical Links - Delrin Bushings on your Mustang

Installation Time

2 hours

Tools Required
  • Hydraulic jack and jack stands
  • Wrenches – 15mm, 18mm, 19mm
American Muscle
Shop Parts in this Guide

1. Lift the rear of the vehicle and safely support with jack stands under the cradle.

2. Using an 18mm wrench, remove the lower bolt on the vertical link as shown in IMAGE 1.

3. Remove the top bolt using a 15mm wrench. Remove vertical link.

4. Install the BMR vertical link using the factory lower bolt and the BMR supplied upper bolt and washer. Use a 19mm wrench to tighten the new upper bolt.

5. Torque the lower bolt to 129 ft/lbs and the upper bolt to 81 ft/lbs.

6. Re-install the wheel/tire and lower the vehicle. 



Best Sellers