Talk to a Mustang Sales Tech
1-877-887-1105
M-F 8:30A-11P, Sat-Sun 8:30A-9P
$12k Summer Sweepstakes! Enter Daily>

Best Sellers

How to Install a C&L Dual Bearing Idler Assembly on Your 2007-2014 GT500 Mustang

Installation Time

2 hours

Tools Required
  • 3/8" Socket
  • 8mm Socket
  • 10mm Socket
  • Other Wrenches/Sockets

Step 1:  

Remove the 10mm bolts holding  the coolant overflow to the fan  shroud. Move the overflow out  of the way so that you can  access the supercharger belt  tensioner.


Step 2:  

Using a 3/8” ratchet apply  pressure so that you can remove  the Super charger belt from the  pulley. **Note: Just fold the  belt out of the way, there is no  need to remove it.


Step 3:  

Remove the (3) 8mm bolts on  the coolant housing (directly  below the supercharger pulley).  Mount the new bracket using  the supplied allen (5mm) head  bolts. Torque to 15 ft-lbs.


Step 4:  

Reinstall the supercharger belt.  **Note: You may need an extra  hand as the belt will be more  difficult to slip behind the  tensioner. Make sure the belt is  aligned correctly on all other  pulleys.


Best Sellers